HPE Power Advisor
Idle Input Power: Utilization Power: Max Load Input Power:
 
Data Center Status Main status icon
Configuration Summary
Power Summary
Data Center Summary

Recommendation Page is Under Construction

Bill of Material

NOTE: Please be advised, this is not a full Bill of Materials. This simplified Bill of Materials has been provided as a feature to assist you in ordering configurations that you have built up in the tool. The parts included in a simplified Bill of Materials relate to the options selected in the configuration process and impact power draw. For further information, including options and part numbers not provided in this tool, please refer the individual server QuickSpecs  

Note: The Preconfigured components of starting point are highlighted in Cyan.
      Power Report
      Current data center Costs
      :
      :
      :
      :
      (Years)
      :
      Total Costs of Ownership
      :

      (Above value is derived using entered PUE value)

      :
      :

      Note: HPE Estimates that it required approximately 1 watt of cooling for every watt consumed by hardware

      Total Cost of Ownership
      Cable Selector
      Source
      :
      :
      :
      :
      :
      :
      Cable Type
      :
      Destination
      :
      :
      :
      :
      :
      :
      Source
      Cable
      Destination
      Edit
      Delete

      NOTE : connection of LINK ports for below Frames are not established.



        Source
        :
        :
        :
        :
        Cable Type
        :
        Destination
        :
        :
        :
        Source
        Cable
        Destination
        Edit
        Delete